To connect a DCU/HPU to TC 110/120, To connect max. 2 accessory components, Including coupling set for G 1/8" venting flange DN 10 ISO-KF
For connection to TC 110/120, Direct control of ACP backing pump (M12 socket), Indirect control of Duo and Pascal backing pumps via additional relay box (M12 socket), For time-delayed triggering of a fore-vacuum safety valve (M8 socket), Control cable (M8 and M12) and relay box are not in scope of delivery
To connect 2 accessory components to an M12 socket on the TC 400/1200 and TM 700, Electronic drive unit connections can be individually configured
Don't worry we won't leave you in a vacuum